What a 10.7 Planning Certificate Shows

What a section 10.7 planning certificate shows, what it leaves out, 10.7(2) vs 10.7(5), and what to check before you buy a house to renovate in NSW.

Deon Du Plessis

11/4/20265 min read

a man riding a skateboard down the side of a ramp
a man riding a skateboard down the side of a ramp

A section 10.7 planning certificate is a document issued by council that lists the planning rules and constraints that apply to a piece of land, such as its zoning, whether complying development is allowed and hazards like flooding or bushfire. It tells you about the land. It does not tell you what has been built on it, whether that work was approved, or whether the extension you're picturing will actually be allowed.

That gap catches out a lot of buyers. Below is what a 10.7 certificate shows, the difference between the two types, what it leaves out, and how to turn it into a real answer about renovation potential. It's written from 20 years of designing and documenting renovations for homeowners on Sydney's Northern Beaches.

What is a section 10.7 planning certificate?

It's issued under section 10.7 of the NSW Environmental Planning and Assessment Act. Many people still call it a "section 149 certificate", its old name, or a zoning certificate. Anyone can apply to council for one for a particular property, and in a sale the buyer's solicitor or conveyancer usually orders it, or the seller attaches one to the contract.

Think of it as a snapshot of the planning rules and constraints attached to the land on the day it was issued.

What is the difference between a 10.7(2) and a 10.7(5) certificate?

  • Section 10.7(2) is the standard certificate. It covers the zoning, the main planning controls that apply, whether complying development can be carried out, and constraints such as flooding, bushfire, contamination and heritage.

  • Section 10.7(5) adds further information council holds about the land, such as advice from other authorities and some other council-held information. The exact extras vary by council.

Fees are set by regulation or council and vary. As a rough guide, councils charge tens of dollars for a 10.7(2) and more for the 10.7(2) plus 10.7(5), so check your council's current schedule. Ask whether you can add the 10.7(5) later, because some councils don't allow a 10.7(2) to be upgraded.

What does a 10.7 certificate not tell you?

This is where most buyers get misled. A 10.7 certificate does not:

  • Show what's built on the land. It covers the land, not the structures. Whether the buildings were approved is a separate question. See our guide to buying a house with unapproved work in NSW.

  • State every development standard. Councils note that it doesn't set out all the standards in the planning instruments. Floor space ratio, setbacks, height and site coverage still need to be looked up and applied to the actual block.

  • Say what you can build. It says what controls apply, not whether your extension, second storey or granny flat will be approved.

  • Replace the approved plans. To see what was approved on the property, you need council's records. See how to get house plans in NSW.

It's also a snapshot. Planning controls and mapping can change, so the certificate is only as current as its issue date.

What should you look for on a 10.7 certificate if you want to renovate?

  1. Zoning. It sets the broad rules for what can be built. Residential zones generally allow alterations and additions, but the controls differ between zones.

  2. Complying development. The certificate says whether complying development can be carried out on the land. If it can't, a Development Application is the likely route. Our guides to DA vs CDC vs exempt development and exempt development on the Northern Beaches explain the difference.

  3. Heritage. A heritage item, or a heritage conservation area, can restrict what you can change and what counts as exempt.

  4. Hazards. Look for bushfire, flood, landslip and similar constraints. They can add reports, conditions and cost.

  5. Other restrictions. Road widening, easements and other constraints that affect where you can build.

On the Northern Beaches the picture is more complicated than most, because several planning instruments still apply across the area and the rules can differ from one street to the next. That's one reason a generic checklist isn't enough.

How do you turn a 10.7 certificate into an answer about renovation potential?

A certificate lists the controls. Working out what they mean for a specific house is the next step:

  1. Read the certificate for zoning, complying development status, heritage and hazards.

  2. Look up the numbers that apply to the block, such as floor space ratio, height and setbacks, and compare them with what's already built.

  3. Compare the approved records with the real house. Unapproved or altered work changes what you can do next.

  4. Test your idea against the controls before you bid, not after.

If you'd rather not do that yourself, our Property Potential Check (from $295 ex GST) compares the planning controls and approved records with what's advertised, so you know what the property could realistically become before you commit. If you already know a project is coming, an Approval Pathway Report sets out which approval route applies. For what to check when you're also thinking about extending, read can you add a second storey or extend a home on the Northern Beaches, and for the wider buying checklist see assessing a house's renovation potential before you buy. To see what a CDC allows on the lot itself, try our free NSW CDC Checker.

Frequently asked questions

What is a section 10.7 planning certificate in NSW?

It's a certificate issued by council that lists the planning controls and constraints that apply to a piece of land, such as zoning, whether complying development is allowed, and hazards like flooding or bushfire. It's also known as a zoning certificate or section 149 certificate.

What is the difference between a 10.7(2) and 10.7(5) certificate?

A 10.7(2) covers the standard planning information. A 10.7(5) includes that information plus additional details council holds about the land, such as advice from other authorities. Check with your council what the 10.7(5) includes and whether a 10.7(2) can be upgraded later.

Does a 10.7 certificate show unapproved building work?

No. It covers the land, not the buildings on it. To find out whether structures were approved, compare council's approved plans with the actual house, and ask about a building information certificate for any unapproved work.

Does a 10.7 certificate tell me if I can extend or add a second storey?

Not directly. It lists the planning controls that apply, but whether an extension is allowed depends on the standards for your block, such as floor space ratio, height and setbacks, and on the approval pathway.

How much does a 10.7 planning certificate cost?

Fees vary by council and by certificate type, and councils update them each year. Check your council's current fees and charges schedule before you apply.

Who gets a 10.7 certificate when buying a house?

Usually the buyer's solicitor or conveyancer orders it, or the seller includes one in the contract. Ask for it early, and read it alongside the approved plans, not instead of them.

Buying a house to renovate?

A certificate is a good start, but it isn't a verdict on the property. Book a free 1-hour consult with Beaches Drafting and we'll talk through the property, what the controls are likely to mean for your plans, and which check suits you. You can also read our guide to buying a house to renovate on the Northern Beaches. Weighing up a knockdown rebuild instead? Read renovate or rebuild: an NSW guide.

Written by Deon Du Plessis, building designer at Beaches Drafting. This page is general information for NSW buyers and homeowners as at 2026 and is not legal advice. What a certificate contains, its fees and the planning controls vary by council and change over time. Confirm the details with your solicitor, your council or an accredited certifier before you rely on them.