Buying a House With Unapproved Work in NSW: What to Do

Buying a house with unapproved work in NSW? How to spot it, your options, and how a building information certificate works, with costs.

Deon Du Plessis

11/1/20267 min read

photo of white staircase
photo of white staircase

Buying a house with unapproved work in NSW is not illegal, but the problem comes with the property. Once you own it, any council enforcement is your problem, not the seller's. The usual way to deal with work that was built without approval is a building information certificate from council. It does not make the work approved, but it stops council ordering it demolished or altered for seven years. Check before you bid, because it's far cheaper to find out before exchange than after.

This guide covers how to spot unapproved work, what to do if you find it, how the certificate works, and what the drawings and costs involve. It's written from 20 years of designing and documenting renovations on Sydney's Northern Beaches.

What counts as unapproved work?

Unapproved work is anything built or changed without the approval it needed, whether that was a development consent from council or a complying development certificate (CDC) from a certifier. Common examples on the Northern Beaches:

  • An enclosed verandah, deck or patio that became a room

  • A garage or under-house area converted to a bedroom, studio or granny flat

  • A bigger footprint or an extra storey than the approved plans show

  • Walls moved or removed, including structural walls

  • Bathrooms or kitchens renovated with no certificates on record

Some owners did it knowingly. Many didn't, because they bought it that way. If you're unsure whether something needed approval, see our guides on renovating without council approval in NSW and bathroom and kitchen approvals.

What does it cost you if you buy it?

Councils can issue orders to repair, alter or demolish unauthorised work, and can issue penalty notices or take court action. One Sydney council's published guidance cites penalty notices of up to $3,000 for an individual, and court fines of up to $1 million in serious cases. Most cases are resolved well short of that, but the real risks for a buyer are practical:

  • Rectification cost. Bringing work up to standard, or removing it, is paid for by the owner at the time.

  • A smaller house than you paid for. A "fourth bedroom" or granny flat that can't be approved doesn't have the value in the listing.

  • Trouble when you renovate. Designers, certifiers and councils work from the approved record. If it doesn't match the house, you may have to resolve the old work before the new project can be approved.

  • Trouble when you sell. The next buyer's solicitor, lender or valuer may ask the same questions.

How do you find out if the work was approved?

  1. Compare the listing with the records. Count the bedrooms, bathrooms and car spaces in the advertisement, then compare them with the approved plans. Our guide on how to get house plans in NSW shows where to find them.

  2. Look at the house against the plans. An enclosed deck, an extension with a different roofline or a converted garage is usually visible on a walk-through.

  3. Read the planning certificate and contract. The contract may disclose known unapproved work. Your solicitor or conveyancer can tell you what it says and what protections you have. For what it does and does not tell you, see what a 10.7 planning certificate shows.

  4. Get a design check, not just a defects inspection. A standard building and pest inspection looks for defects. It doesn't compare the house with the approvals. See what a standard inspection doesn't cover.

What are your options if you find unapproved work?

  1. Walk away. If the unapproved part is a big part of the value, or the house can't realistically be approved, this is a legitimate answer.

  2. Renegotiate. If the work can be regularised, ask for a price reduction that covers the likely cost and time. Your solicitor can advise on how to build that into the contract.

  3. Ask for a building information certificate before you exchange. The vendor can apply for one, and a buyer can apply too once a contract exists. Your solicitor can advise on the timing.

  4. Buy and regularise after settlement. This is common, but you carry the cost and the risk that council wants changes. Price it before you commit.

Remember there's no cooling-off period at auction, so the checking has to happen beforehand.

What is a building information certificate?

A building information certificate (BIC) is a certificate issued by council under the Environmental Planning and Assessment Act 1979. The NSW Planning Portal says it's generally the only option to regularise work that is already built, because development consent and construction certificates can't be obtained for a building that already exists. So when people ask about "retrospective approval" in NSW, the BIC is usually what they mean.

A BIC covers all or part of a building. Once it's issued, council can't, for seven years, order the covered work to be repaired, demolished, altered or rebuilt, or start civil proceedings about encroachment onto council land. Three limits matter:

  • It is not an approval. It's closer to a "no action" certificate for the work it covers.

  • It doesn't block everything. Councils can still issue fire safety orders, and some councils note they can still issue penalty notices for the unauthorised work.

  • The seven years run out. After that, the protection lapses. In practice councils rarely act on long-standing, compliant work, but you shouldn't rely on that, and any new work needs its own approval.

The owner can apply. So can someone with the owner's consent, and a purchaser under a contract of sale (including their solicitor or agent). Applications go through the NSW Planning Portal, and the Portal's guidance on building information certificates is the official starting point.

What does a BIC application need?

Requirements differ between councils, so check yours, but a typical application includes:

  • A survey report and plan showing the property and buildings as they exist when you apply (for residential land, an original or certified copy)

  • Building plans and specifications of the work, if the council asks for them

  • Certificates the council asks for, such as for waterproofing in wet areas or structural adequacy where there's doubt

  • The owner's consent, signed by all owners

  • The application fee

The council assesses the work, usually inspects the building, and decides. If it can't issue a certificate and the work can't be approved another way, it can take action to have the work removed or altered. That's why it's worth knowing whether the work is likely to pass before you buy.

How much does it cost?

Council sets its own statutory fee, and in many councils it's linked to the fees that would apply to a development application and construction certificate for the work, plus an inspection charge. It varies by property and work, so check the current fee schedule for your council (for Northern Beaches Council, phone 1300 434 434). On top of that, you'd normally need the drawings:

  • As-built drawings: we prepare measured, as-built plans of the existing house from $495, and about $1,200 for a larger double-storey house.

  • Any certificates or an engineer's report the council asks for, quoted separately by the relevant specialist.

Our prices exclude GST. Council fees are separate and set by council.

Unapproved work is only one of the things that can change what a house is worth to you. Before you bid, it also pays to know whether the house can be extended or reworked at all. Our guide to assessing renovation potential before you buy covers setbacks, floor space ratio, heritage and the planning checks to run first.

How can Beaches Drafting help?

We're building designers, not lawyers or certifiers, so we don't give legal advice or issue the certificate. What we do is the design side of the problem:

  • Before you bid: a Property Potential Check (from $295 ex GST) compares the planning controls and approved records with what's advertised. A pre-purchase report (from $1,500 ex GST) looks at the house itself, including work that appears to differ from the approvals.

  • After you buy, or if you already own it: measured as-built drawings to support a BIC application, and an Approval Pathway Report (from $495 ex GST) for what to do next if you also want to renovate.

Frequently asked questions

Is it illegal to buy a house with unapproved work?

No. The purchase is legal, but the unapproved work stays with the property, so any council enforcement becomes the new owner's responsibility. That's why you should check before exchange, not after.

Can a buyer apply for a building information certificate?

Yes, a purchaser under a contract of sale (including their solicitor or agent) can apply, as can the owner or someone with the owner's consent. Talk to your solicitor about whether to ask the vendor to apply before exchange or to apply yourself afterwards.

Does a building information certificate make the work legal?

Not exactly. It stops council ordering the covered work to be repaired, demolished or altered for seven years, but it isn't a development consent, and it doesn't stop fire safety orders. Some councils can still issue penalty notices for the unauthorised work.

How much does a building information certificate cost?

The fee is set by the council and varies with the work, and councils commonly charge an inspection fee as well. Check your council's current fee schedule. You'll also need drawings, and our as-built plans start at $495 (ex GST), or about $1,200 for a larger double-storey house.

How long does a building information certificate take?

It depends on the council, how complete the application is and what the inspection finds. Councils don't generally commit to a fixed time, so ask yours for its current processing time before you plan around it.

What happens if council won't issue a certificate?

The council can take action to have the work altered, made safe or removed. That's the risk you're pricing when you buy, and why it's worth asking a designer whether the work is likely to be accepted before you commit.

How do I find out if a house has unapproved work?

Compare the approved plans and certificates from council with the house itself and the listing. A designer can do the comparison on site, which a standard building and pest inspection doesn't cover.

Buying, or already own a house you're unsure about?

Tell us the address and what worries you. We'll say whether a Property Potential Check, a pre-purchase report or as-built drawings fits. See our property advice and reports or book a conversation. You can also read about what a building designer costs in NSW.

Written by Deon Du Plessis, building designer at Beaches Drafting. This page is general information for NSW property owners and buyers as at 2026 and is not legal advice. Council processes, fees and timeframes vary, and what applies depends on your property and contract. Confirm with your solicitor, your council or an accredited certifier before relying on it.